Pre-launch · recruiting operators for 2027 savings studies

The autopilot for your radio access network

Ranpilot trains energy and capacity policies in an RF twin of your network, proves them against your QoS bounds, then runs them at the edge.

Sample network · Metro-1203:00Example
  • Awake, light load
  • Awake, busy
  • Near capacity
  • Asleep
−38%Radio energy
13 msp95 latency
36/60Cells asleep

36 of 60 cells asleep. Busiest awake cell at 47% PRB. p95 latency 13 ms, inside the 20 ms bound.

ExampleToy model of 60 cells. Drag the time, switch the mode, watch cells sleep and wake. Illustrative, not Ranpilot results.

Instruments

Four levers, moved every interval

Today these are static vendor parameters, tuned by hand once a quarter.

Per cell

Sleep and wake

Sectors rest when neighbours can carry the load.

Per carrier

Carriers off

Capacity layers switch off at night. The coverage layer stays up.

Per beam

Steer and balance

Beams, tilts and handover offsets follow traffic through the day.

Per sector

Power and MIMO

Transmit power and antenna layers trimmed above your coverage floor.

Problem

The RAN runs on settings nobody has time to change

Energy

Idle radios burn power

Quiet cells stay fully awake at 3 a.m. on the network's biggest energy bill.

Capacity

Capacity in the wrong place

Static beams leave hotspots congested while the cell next door idles.

Risk

No proof a change is safe

Sleep features ship switched off because nobody can show they hold QoS.

Loop

Five systems, one loop

Train in one twin, run at the edge, explain every action.

SIMTwinixNRGVoltariCAPCellixRTEdgoraRANLive RANCPLSenovatelemetry and outcomes recalibrate the twinbounded actions

Flight plan

From telemetry to autopilot in five phases

  1. CAL

    Calibrate the twin

    Twinix fits a ray-traced model to your KPIs and RF data until it tracks the live network.

    Weeks 1–4 · example timing

  2. TRN

    Train the agents

    Voltari and Cellix learn across millions of simulated days, storms and events included.

    Weeks 3–6

  3. GATE

    Pass the safety gate

    Every policy replays against your QoS bounds. A breach keeps it in the hangar.

    Each release

  4. ENG

    Engage at the edge

    Edgora rolls out canary first, with one-step rollback.

    Canary first

  5. MON

    Monitor and recalibrate

    Live outcomes recalibrate the twin. Senova reports verified savings.

    Continuous

Read the full flight plan

Who it's for

For whoever owns the radios

For engineers

Policies you can read before they run

policy.yaml · example
# a Voltari energy policy, as your team would review it
policy: "metro-12-night-sleep"
scope:
  region: "metro-12"
  cells: "tag:residential"
objective: "minimise radio energy"
bounds:
  latency_p95_ms: 20
  throughput_floor: "95% of forecast demand"
  max_cells_asleep: "60%"
gate:
  twin_replay_days: 90
  rollout: ["canary-3-sites", "region"]
rollback: "on any bound breach"

Scope, objective, bounds and rollout in one short file. Your engineers approve it like a parameter change.

If the twin can't prove the bounds, the policy is never offered.

See integrations and the API

FAQ

Questions network teams ask

Does Ranpilot replace our vendor's energy features?

No. It decides when and where to use the levers your RAN already exposes.

What stops a policy from hurting QoS?

The twin gate before rollout, live bound checks at the site, and instant rollback on any breach.

Do we need GPU RAN to start?

No. A savings study runs in the twin from your telemetry, and live control works on today's RAN.

How much energy will we save?

Nobody can say before seeing your network. A savings study estimates it from your telemetry, assumptions stated.

Next step

See what your network could save

We replay a quarter of your telemetry in the twin and show where cells could have slept.