Recruiting design partners for 2027

Pilot program

Start with a savings study

Share one region's telemetry under NDA. Get a calibrated twin, a cell-by-cell savings estimate and an optional live canary.

The study · example
Input
One region, one quarter of telemetry
Output
Tolerance report, savings estimate
Then
Optional live canary
Places
Limited

Benefits

What design partners get

A twin and a savings estimate

Your region, calibrated, with cell-by-cell savings and stated assumptions.

A say in the roadmap

Your bounds and your NOC shape the product, with direct engineering access.

Early terms

Favourable terms for first production regions. No site changes to start.

Plan

Week by week

  1. W1

    Kick-off and NDA

    Agree scope, bounds and exports.

  2. W2–4

    Calibrate

    Build the twin; share the tolerance report.

  3. W4–6

    Train and replay

    Train Voltari; replay the quarter.

  4. W6

    Readout

    Results for RAN, energy and finance teams.

  5. Then

    Canary (optional)

    Three to five sites under Edgora.

Draft plan. Timing depends on data access.

Fit

Who fits the first studies

Good fit
  • Hundreds to thousands of sites
  • Last quarter's PM and CM exports
  • An energy target
Not yet
  • No programmatic configuration access
  • Need a certified system today

Apply

Request a savings study

Application
What happens next
  • Reply within two working days
  • Call with your RAN and energy leads
  • Written study plan and draft terms

pilot@ranpilot.com

FAQ

Pilot questions

What does the study cost?

Terms are agreed per operator in the written study plan.

Does data leave our network?

Agreed exports go to an isolated tenancy, or we run the study on premises. The twin is yours.