How it works
Twin first, then live
No policy reaches a live cell until it has flown thousands of simulated days and held every bound you set.
- CAL
- Calibrate the twin
- TRN
- Train the agents
- GATE
- Pass the safety gate
- ENG
- Engage at the edge
- MON
- Monitor and recalibrate
Phases
Five phases, with example timing
- CAL
Calibrate the twin
We read your PM, CM, energy and MDT exports. Twinix tunes a ray-traced model until simulated KPIs match live ones within an agreed tolerance.
Weeks 1–4
- TRN
Train the agents
Voltari learns sleep, carrier, power and MIMO. Cellix learns beams, load and neighbours. Both train on your peaks, storms and stadium nights.
Weeks 3–6, then continuous
- GATE
Pass the safety gate
Each policy replays a quarter of your traffic. One broken bound fails it, and Senova shows where.
Every release
- ENG
Engage at the edge
Canary sites, then a cluster, then the region. Bounds checked before every action; one-step rollback.
Canary for two weeks minimum
- MON
Monitor and recalibrate
Every action is logged. Senova reports savings against a counterfactual baseline.
Continuous
Responsibility
Who does what
| Task | Your team | Ranpilot |
|---|---|---|
| Set QoS and SLA bounds | Owns and signs off | Proposes defaults |
| Approve each policy | Approves or rejects | Presents gate results |
| Rollout and rollback | Picks canaries, can roll back | Operates Edgora |
| Report savings | Agrees the baseline | Produces the report |
Configuration
Your bounds, written down
# bounds a NOC signs off, per region · example
region: "metro-12"
bounds:
latency_p95_ms: 20
drop_rate_max: "0.5%"
coverage_rsrp_dbm_min: -110
never_sleep: ["tag:hospital", "tag:emergency"]
hours:
sleep_allowed: "00:00-06:30"
on_breach: "rollback-region"
The contract between your NOC and the autopilot: what must never happen, where it may act, what to do on a breach.
Critical cells, such as hospitals, never sleep.
FAQ
Questions network teams ask
What if the twin is wrong?
We measure it. Policies are only offered where the tolerance report shows close agreement.
Can we start in advisory mode?
Yes. Senova recommends actions for engineers to apply by hand first.
Next step
Begin with calibration
Send a quarter of telemetry under NDA. Get back a tolerance report and a first savings estimate.